Home » Sectors » Here

RAF Fairbourne

RAF Fairbourne

RAF Fairbourne is a training centre used by the RAF for outdoor activities. The contract awarded was to construct a →
Read more about this New Build building contractor project

Period : 30 weeks

Tags : New Build

Value : £1,200,000

Specialist Defence Organisation

Specialist Defence Organisation

The conversion and fit out of two new build, single storey industrial units to provide 1000m² of specialist equipment repair, →
Read more about this Fit out building contractor project

Period : 22 weeks

Tags : Fit out

Value : £1,800,000

House Building Cheshire

House Building Cheshire

When two plots became available for this house building project located in Cheshire, a unique opportunity was provided to design →
Read more about this New Build building contractor project

Period : 29 weeks

Tags : New Build

Value : £400,000

House Building North Wales Flintshire

House Building North Wales Flintshire

This design and build bespoke house building project located in North Wales was to provide a quality residence with low →
Read more about this Design and Build building contractor project

Period : 26 weeks

Tags : Design and Build

Value : £180,000

House Building North Wales Denbighshire

House Building North Wales Denbighshire

The award of this contract to bring forward general planning intent to a finalised scheme facilitated the engagement of all →
Read more about this New Build building contractor project

Period : 27 weeks

Tags : New Build

Value : £230,000

Argoed House Heritage North Wales

Argoed House Heritage North Wales

A house building project in Llangollen, north Wales requiring conversion of a large house into quality multi occupancy accommodation necessitated a broad →
Read more about this Refurbishment building contractor project

Period : 26 weeks

Tags : Refurbishment

Value : £120,000

Cheshire Fire Station

Cheshire Fire Station

This significant project embraced all the challenges of demolition, constructing new build and major refurbishment works all encapsulated by our →
Read more about this New Build Refurbishment building contractor project

Period : 50 weeks

Tags : New Build Refurbishment

Value : £2,200,000

Office Sure Group North Wales

Office Sure Group North Wales

When the Sure Group acquired EMS Ltd, they had no hesitation in negotiating this refurbishment contract with ourselves. Responding to →
Read more about this Refurbishment building contractor project

Period : 4 weeks

Tags : Refurbishment

Value : £40,000

Rhyn Park School - Bricklayer Vocational Training Centre

Rhyn Park School - Bricklayer Vocational Training Centre

This simple framed structure, offers a low cost solution to the school with minimal maintenance requirements. Constructed within a live →
Read more about this Extension building contractor project

Period : 10 weeks

Tags : Extension

Value : £140,000

Penymynydd Church

Penymynydd Church

Supporting the needs of the Church over a number of years, works have included re-roofing and associated lead and rain →
Read more about this Refurbishment building contractor project

Period : ongoing

Tags : Refurbishment

Value : £At Net Cost

Sauna Minor Building Works North Wales

Sauna Minor Building Works North Wales

A tasteful Finnish sauna refurbishment. This small works project had a very short (3 weeks) life span in which it →
Read more about this Refurbishment building contractor project

Period : 3 weeks

Tags : Refurbishment

Value : £12,500

Stockbridge Village Health Care North West

Stockbridge Village Health Care North West

The remodelling and extension of a health facility within a live environment, complimented with maintaining all operational services was addressed →
Read more about this Refurbishment Extension building contractor project

Period : 16 weeks

Tags : Refurbishment Extension

Value : £600,000

Birkenhead School 6th Form Facilities

Birkenhead School 6th Form Facilities

Working in a collaborative ethos, this project was delivered with total understanding of costs by all stakeholders. Read’s value management →
Read more about this New Build building contractor project

Period : 24 weeks

Tags : New Build

Value : £400,000

Holy Trinity School Oswestry

Holy Trinity School Oswestry

Working within the centre of a live school, with acute programming constraints, this phased project to extend and refurbish part →
Read more about this Refurbishment Extension building contractor project

Period : 44 weeks

Tags : Refurbishment Extension

Value : £1,700,000

Retail Store Tesco North West

Retail Store Tesco North West

With Tesco waiting to move into a new store, and GBB Estates requirements to build a new retail store exceptionally →
Read more about this Design and Build building contractor project

Period : 24 weeks

Tags : Design and Build

Value : £380,000

Walford and North Shropshire College - Engineering Block

Walford and North Shropshire College - Engineering Block

Access and egress constraints through this live agricultural campus for staff, students and animals presented a unique challenge. With a →
Read more about this New Build building contractor project

Period : 22 weeks

Tags : New Build

Value : £400,000

Gresty Brook Health Care North West

Gresty Brook Health Care North West

Working within a live environment, phased works, exceptionally challenging logistics, whilst maintaining attention to architectural excellence is a challenge with →
Read more about this Extension building contractor project

Period : 37 weeks

Tags : Extension

Value : £600,000

Tom Cleator House Clinic North West

Tom Cleator House Clinic North West

Comprising of four individual extensions, together with the refurbishment of the medical centre, this project was delivered to a delighted →
Read more about this Refurbishment Extension building contractor project

Period : 12 weeks

Tags : Refurbishment Extension

Value : £750,000

Paediatric Unit Hospital North West

Paediatric Unit Hospital North West

The total remodelling of the third floor to provide a new leading edge Paediatric Unit within a live hospital presented →
Read more about this Refurbishment building contractor project

Period : 28 weeks

Tags : Refurbishment

Value : £1,500,000

Ysgol Bryn Alyn - Gwersyllt

Ysgol Bryn Alyn - Gwersyllt

Continuing our long term and immensely successful working relationship with Wrexham County Borough Council, this BREEAM 'Excellent' project delivered to the →
Read more about this New Build BREEAM building contractor project

Period : 53 weeks

Tags : New Build BREEAM

Value : £2,700,000

House Building North Wales - Rhyl - Denbighshire

House Building North Wales - Rhyl - Denbighshire

The house building refurbishment of semi derelict properties provided an opportunity to rejuvenate the local townscape and provide new homes →
Read more about this Refurbishment building contractor project

Period : 32 weeks

Tags : Refurbishment

Value : £800,000

Our Lady of Lourdes - Wallasey

Our Lady of Lourdes - Wallasey

Two separate projects combined to rejuvenate this Church in providing new up to date facilities within a refurbished envelope. Complimenting →
Read more about this New Build building contractor project

Period : 20 weeks

Tags : New Build

Value : £260,000

Hawarden High School Roofing Minor Building Works North Wales

Hawarden High School Roofing Minor Building Works North Wales

With a number of constraints impacting on the project planning and delivery, this project was successfully completed by the Minor →
Read more about this Refurbishment building contractor project

Period : 8 weeks

Tags : Refurbishment

Value : £40,000

New R C Church - Latchford

New R C Church - Latchford

A new church is a beacon within the community that will display with pride its presence. The compliment of material →
Read more about this New Build building contractor project

Period : 34 weeks

Tags : New Build

Value : £1,200,000

Environmental Services Depot North Wales

Environmental Services Depot North Wales

With the financial demise of the previous main contractor, the works centred on “picking up the pieces",  reviewing and assessing →
Read more about this Refurbishment building contractor project

Period : 14 weeks

Tags : Refurbishment

Value : £550,000

Gobowen Hospital Ludlow Ward North Wales

Gobowen Hospital Ludlow Ward North Wales

This project comprised the construction of a traditional new single storey extension to the existing outpatients ward.  It also involved →
Read more about this Extension building contractor project

Period : 18 weeks

Tags : Extension

Value : £491,000

Civil Engineering Helipad North Wales

Civil Engineering Helipad North Wales

This unique project involved the construction of a new helipad facility for the Robert Jones and Agnes Hunt Orthopaedic Hospital, →
Read more about this New Build building contractor project

Period : 10 weeks

Tags : New Build

Value : £315,000

New Church Kirkby

New Church Kirkby

Construction of a new Church on the site of the former All Angels Church, including refurbishment works to the existing →
Read more about this New Build building contractor project

Period : 42 weeks

Tags : New Build

Value : £1,135,000

Golf Driving Range North Wales

Golf Driving Range North Wales

Delivered to a repeat customer fast and to the usual high quality award winning Read standard. Starting from scratch in →
Read more about this Design and Build building contractor project

Period : 9 weeks

Tags : Design and Build

Value : £80,000

Glanbia Factory North Wales

Glanbia Factory North Wales

Constructing both new build and refurbishment works whilst working within a live manufacturing plant presents many logistical challenges; ongoing production →
Read more about this New Build Refurbishment building contractor project

Period : 18 weeks

Tags : New Build Refurbishment

Value : £120,000

Dexa Scanner Leighton Hospital Cheshire

Dexa Scanner Leighton Hospital Cheshire

The provision of this new facility within the central area of the hospital necessitated all Client requirements to be addressed →
Read more about this New Build building contractor project

Period : 6 weeks

Tags : New Build

Value : £40,000

Design Technology and Science Block Birkenhead

Design Technology and Science Block Birkenhead

Working within the central core of the school, with difficult logistical challenges, together with maintaining utilities to the existing school →
Read more about this New Build building contractor project

Period : 28 weeks

Tags : New Build

Value : £630,000

African Painted Dogs Exhibit Cheshire

African Painted Dogs Exhibit Cheshire

Delivering a world class exhibit within the confines of an exceptionally busy world class visitor centre is no insignificant achievement.  →
Read more about this Refurbishment building contractor project

Period : 17 weeks

Tags : Refurbishment

Value : £350,000

Holly Bush Barn Wrexham

Holly Bush Barn Wrexham

The adaption of this barn conversion to a modern state of the art residential dwelling supporting a special needs requirement was handed →
Read more about this Refurbishment building contractor project

Period : 14 weeks

Tags : Refurbishment

Value : £190,000

Retro Cafe North West

Retro Cafe North West

Working within the central core of the Hospital main entrances was always going to present a challenge. Through careful planning, →
Read more about this Fit out Design and Build building contractor project

Period : 2 weeks

Tags : Fit out Design and Build

Value : £15,000

Countess of Chester Hospital Radiology

Countess of Chester Hospital Radiology

Multiple phases, out of hours working, retained patient services, maintaining live services with exceptionally challenging access and egress issues within →
Read more about this Refurbishment building contractor project

Period : 16 weeks

Tags : Refurbishment

Value : £208,000

Hair and Beauty Salon North Wales

Hair and Beauty Salon North Wales

Constrained by a 6 week deadline, this contract involved extensive remodelling and refurbishment with the conversion of three rooms to →
Read more about this Refurbishment building contractor project

Period : 7 weeks

Tags : Refurbishment

Value : £145,000

NU Instruments Industrial North Wales

NU Instruments Industrial North Wales

With a tender sum exceeding the Client's budget, Read worked with the Client and Design Team to deliver Value Management →
Read more about this New Build Refurbishment building contractor project

Period : 26 weeks

Tags : New Build Refurbishment

Value : £600,00

Shotton Primary School

Shotton Primary School


Read more about this New Build Partnering building contractor project

Period : 104 weeks

Tags : New Build Partnering

Value : £9,000,000

Butterfly House North West

Butterfly House North West

This replacement facility represents a significant commitment by the Zoo. Delivering each and every project within the Zoo offers individual →
Read more about this New Build building contractor project

Period : 17 weeks

Tags : New Build

Value : £480,000

Islands in Danger Cheshire

Islands in Danger Cheshire

Set within the centre of the Zoo, adjacent to the mono rail, the rail bridge crossing and formal gardens, this →
Read more about this Design and Build building contractor project

Period : 12 weeks

Tags : Design and Build

Value : £160,000

Animal Healthcare North West

Animal Healthcare North West

Delivering Health Care provision at the Countess of Chester just three miles from the Zoo has the same objectives: “Care →
Read more about this New Build building contractor project

Period : 44 weeks

Tags : New Build

Value : £460,000

Warty Pigs North West

Warty Pigs North West

This small scale project demanded the same degree of planning as any large capital project; needless to say the Pigs →
Read more about this New Build building contractor project

Period : 4 weeks

Tags : New Build

Value : £40,000

Realm of the Red Ape House Cheshire

Realm of the Red Ape House Cheshire

This internal fit out and finishing project supported the delivery of a major new facility within the Zoo. Appointed to →
Read more about this Fit out building contractor project

Period : 8 weeks

Tags : Fit out

Value : £50,000

Main Entrance Zoo North West

Main Entrance Zoo North West

Working on the main entrance with thousands of visitors surrounding the site was the ultimate challenge in safe delivery, planning, →
Read more about this Refurbishment building contractor project

Period : 21 weeks

Tags : Refurbishment

Value : £670,000

Okapi House North West

Okapi House North West

Adjoining the Giraffe house, the new Okapi project included both new extensions and external works. The new walk through enclosure →
Read more about this Extension building contractor project

Period : 18 weeks

Tags : Extension

Value : £250,000

Warthogs and Mongoose Cheshire

Warthogs and Mongoose Cheshire

The relocation of the Warthogs and Mongooses to a new enclosure necessitated the provision of a new paddock, moat, retaining →
Read more about this Refurbishment building contractor project

Period : 14 weeks

Tags : Refurbishment

Value : £150,000

Ruthin School Sports Centre North Wales

Ruthin School Sports Centre North Wales

Completion of a new sports hall within an existing school campus following the liquidation of the original contractor employed to →
Read more about this Extension building contractor project

Period : 40 weeks

Tags : Extension

Value : £1,000,000

Restaurant Tsavo Cafe Cheshire

Restaurant Tsavo Cafe Cheshire

Through a process of value management and engineering, this project was brought within budget, whilst still delivering the desired outcome →
Read more about this Fit out building contractor project

Period : 44 weeks

Tags : Fit out

Value : £1,700,000

McAllister Pavilion Sports North West

McAllister Pavilion Sports North West

A negotiated contract for the alteration and refurbishment of an existing sports pavilion and construction of a new extension to →
Read more about this New Build Refurbishment Extension building contractor project

Period : 26 weeks

Tags : New Build Refurbishment Extension

Value : £410,000

Llanfwrog Tennis Court North Wales

Llanfwrog Tennis Court North Wales

A partnering contract to deliver a new two storey tennis centre with four new external floodlit courts with associated external →
Read more about this New Build building contractor project

Period : 36 weeks

Tags : New Build

Value : £510,000

Cheshire County Sports North West

Cheshire County Sports North West

A design and build contract for the construction of a detached 2 storey clubhouse to include changing facilities, officials rooms, first →
Read more about this Design and Build building contractor project

Period : 32 weeks

Tags : Design and Build

Value : £895,000

Belvidere Sports Centre Shropshire

Belvidere Sports Centre Shropshire

A design and build contract for the construction of a new sports hall including changing, staff, storage and toilet facilities. →
Read more about this Design and Build building contractor project

Period : 32 weeks

Tags : Design and Build

Value : £850,000

Queen Hotel North West

Queen Hotel North West

Fit out of new meeting rooms and link corridor, joining the main Queen hotel with the Thistle House building (later →
Read more about this Refurbishment Fit out building contractor project

Period : 28 weeks

Tags : Refurbishment Fit out

Value : £650,000

Barlow UK Cheshire

Barlow UK Cheshire

Working for our supply chain is clear evidence of the mutual respect between Client and Customer, and Customer and Client. →
Read more about this New Build building contractor project

Period : 24 weeks

Tags : New Build

Value : £610,000

Veterinary Centre Cheshire

Veterinary Centre Cheshire

One of the many "off show" developments completed for another of our repeat clients. A typically bespoke building with many →
Read more about this New Build building contractor project

Period : 20 weeks

Tags : New Build

Value : £460,000

Tsavo Rhino House North West

Tsavo Rhino House North West

A simple looking building containing advanced structural and environmental management systems and technology.  This new build project is favoured by →
Read more about this New Build building contractor project

Period : 28 weeks

Tags : New Build

Value : £380,000

Gritter Depot North Wales

Gritter Depot North Wales

The administrative building and gritter shed combined both commercial and industrial works. Delivered with zero accidents our Health and Safety →
Read more about this New Build building contractor project

Period : 26 weeks

Tags : New Build

Value : £480,000

Knauf Insulation North West

Knauf Insulation North West

Read has an ongoing flexible relationship with Knauf on both their Deeside and St Helens sites and are now a much →
Read more about this Refurbishment building contractor project

Period : 350 weeks

Tags : Refurbishment

Value : £1,500,000

Jaguar House Cheshire

Jaguar House Cheshire

This project represents one of the largest single investments within the Zoo. The front of house exhibit allows the public →
Read more about this New Build building contractor project

Period : 44 weeks

Tags : New Build

Value : £1,700,000

Nightingale House Hospice Health Care North Wales

Nightingale House Hospice Health Care North Wales

A traditional contract for the construction of a three storey extension to the existing hospice providing additional administration space including →
Read more about this Extension building contractor project

Period : 31 weeks

Tags : Extension

Value : £600,000

Wrexham Maelor Hospital North Wales

Wrexham Maelor Hospital North Wales

A negotiated contract for the North East Wales NHS Trust for the construction of new build offices and surgical areas. →
Read more about this New Build building contractor project

Period : 42 weeks

Tags : New Build

Value : £2,260,000

Bangor University - Bio Sciences and Environmental Alliance

Bangor University - Bio Sciences and Environmental Alliance

The refurbishment of this 1970 third floor laboratory to a state of the art provision within an exceptionally short time →
Read more about this Refurbishment building contractor project

Period : 12 weeks

Tags : Refurbishment

Value : £250,000

Heswall Golf Club House North West

Heswall Golf Club House North West

A significant traditionally built extension and total refurbishment and refenestration of the existing facilities. Works were carried out to the →
Read more about this Refurbishment Extension Refenestration building contractor project

Period : 30 weeks

Tags : Refurbishment Extension Refenestration

Value : £1,290,000

Sandbach School North West

Sandbach School North West

Construction of new dance & drama studios and three new teaching classrooms. Included within the project was the formation of →
Read more about this New Build building contractor project

Period : 24 weeks

Tags : New Build

Value : £1,200,000

Head Office Enterprise Centre North Wales

Head Office Enterprise Centre North Wales

The design and build requirements of this internal fit out project, afforded the opportunity to fully assess the business needs →
Read more about this Fit out Design and Build building contractor project

Period : 10 weeks

Tags : Fit out Design and Build

Value : £200,000

Smithy Farm North Wales

Smithy Farm North Wales

The conversion of this redundant farm for Grosvenor Estates in Cheshire presented a unique opportunity to combine both Read’s traditional →
Read more about this Refurbishment building contractor project

Period : 25 weeks

Tags : Refurbishment

Value : £580,000

Woodhouse Farm North West

Woodhouse Farm North West

What a privilege to deliver a project with many rewarding challenges and significant personal pleasure. Our Site Manager, Mike Gannon →
Read more about this Refurbishment building contractor project

Period : 14 weeks

Tags : Refurbishment

Value : £220,000

Lea Hall Farm North West

Lea Hall Farm North West

Yet another successfully completed conversion project for the Grosvenor Estate at Aldford, Chester. The latest conversion contract at Lea Hall →
Read more about this Refurbishment building contractor project

Period : 20 weeks

Tags : Refurbishment

Value : £640,000

Clatterbridge Hospital North West

Clatterbridge Hospital North West

Complete demolition and strip out of former mental health day therapy unit and remodelling / refurbishment to form new Psychiatric →
Read more about this Refurbishment building contractor project

Period : 42 weeks

Tags : Refurbishment

Value : £1,850,000

Visitor Centre The Mere North Wales

Visitor Centre The Mere North Wales

A contract awarded on a traditional tender basis for a scheme of improvements at the Mere visitor attraction. The scheme →
Read more about this Refurbishment building contractor project

Period : 26 weeks

Tags : Refurbishment

Value : £1,400,000

Cedar House Sustainable North West

Cedar House Sustainable North West

The development and investment within the administrative infrastructure of the Zoo compliments the development and investment within the public area. →
Read more about this New Build Fit out building contractor project

Period : 100 weeks

Tags : New Build Fit out

Value : £1,900,000

West Coast Energy North Wales

West Coast Energy North Wales

The commission to develop this new BREEAM building has fully demonstrated our ability to deliver excellent projects. With clear Client →
Read more about this Design and Build BREEAM building contractor project

Period : 40 weeks

Tags : Design and Build BREEAM

Value : £1,750,000

Elephants of the Asian Forest Building Cheshire

Elephants of the Asian Forest Building Cheshire

Some projects are large scale, others are quite simply unique. This indeed was a unique project; maintaining the existing usage →
Read more about this Refurbishment building contractor project

Period : 46 weeks

Tags : Refurbishment

Value : £2,200,000

St. Anselm’s College - The Food Hub

St. Anselm’s College - The Food Hub

This project always had the potential to stand out from the crowd; its Award Winning Status is testament to effective →
Read more about this New Build building contractor project

Period : 28 weeks

Tags : New Build

Value : £390,000

Ysgol Maes Garmon Flintshire

Ysgol Maes Garmon Flintshire

Extensions (300m² admin and 800m² design & technology blocks) and refurbishment (300m² music suite, 700m² science laboratories and library) of →
Read more about this Refurbishment Extension building contractor project

Period : 66 weeks

Tags : Refurbishment Extension

Value : £2,400,000

King Hotel North West

King Hotel North West

Feathers Group were looking for hotel fit out contractors in the North West region for the conversion of a 7 →
Read more about this Fit out building contractor project

Period : 26 weeks

Tags : Fit out

Value : £2,450,000

Royal Liverpool Golf Club House North West

Royal Liverpool Golf Club House North West

The works carried out at Royal Liverpool Golf Club were completed well in advance of the British Open championship, which →
Read more about this Extension building contractor project

Period : 25 weeks

Tags : Extension

Value : £1,660,000

Wrexham Tennis Centre North Wales

Wrexham Tennis Centre North Wales

Wrexham Tennis Centre, premier centre of excellence for tennis in North Wales and North West. Extension to the indoor facility →
Read more about this New Build Extension building contractor project

Period : 20 weeks

Tags : New Build Extension

Value : £480,000

Neston Cricket Club House North West

Neston Cricket Club House North West

Working within a live facility, maintaining the club's ongoing operations was a key driver in the delivery of this project. →
Read more about this New Build building contractor project

Period : 27 weeks

Tags : New Build

Value : £640,000

Countess of Chester Hospital North Wales

Countess of Chester Hospital North Wales

Four year Measured Term Contract covering client works ranging from £100 to £1,350,000. Through close working relationships with the estates →
Read more about this Refurbishment building contractor project

Period : 208 weeks

Tags : Refurbishment

Value : £2,800,000 per annum

Fir Grove Hotel North West

Fir Grove Hotel North West

Erection of a steel framed conservatory style frontage with glazed curtain walling and a flat roof over, together with a →
Read more about this Refurbishment building contractor project

Period : 15 weeks

Tags : Refurbishment

Value : £335,000

Heritage Building at Tyn Dwr Hall Building North Wales

Heritage Building at Tyn Dwr Hall Building North Wales

Internal and external refurbishment of a Grade II Listed Victorian manor house from former use as a YHA outdoor pursuit →
Read more about this Refurbishment building contractor project

Period : 36 weeks

Tags : Refurbishment

Value : £1,800,000

Chester Catholic High School

Chester Catholic High School

Major new build and refurbishment project to expand the services offered by the school. The project comprised the construction of →
Read more about this New Build Refurbishment Extension building contractor project

Period : 40 weeks

Tags : New Build Refurbishment Extension

Value : £3,200,000

Bala Rural Life Centre North Wales

Bala Rural Life Centre North Wales

The works concern the construction of 2 new and renovation of 2 existing derelict structures for the purpose of exhibition, →
Read more about this New Build Refurbishment building contractor project

Period : 48 weeks

Tags : New Build Refurbishment

Value : £1,800,000

All Through School - Connah’s Quay

All Through School - Connah’s Quay

  The project involves building one new school on the existing playing fields, then demolishing the two old school buildings →
Read more about this New Build Partnering building contractor project

Period : ongoing

Tags : New Build Partnering

Value : £6,000,000

Corn Mill restaurant North Wales

Corn Mill restaurant North Wales

We are very proud of this refurbished restaurant alteration of a derelict and structurally unsafe former corn mill building dating →
Read more about this Refurbishment building contractor project

Period : 22 weeks

Tags : Refurbishment

Value : £1,000,000


Latest Sector Activity

Testimonials

Awards

    North Wales LABC Building Excellence Awards 2011
    Best Apartment Project 2011 Award
    Performance Beyond Compliance Bryn Alyn School
    Yale Skill Build Work Experience Programme
    Built in Quality Awards - Rochester House
    Built in Quality Awards - Cedar House
    LABC Best Commercial Development - Tennis Centre
    Investor in People
    Investor in People
    Built in Quality Awards - Jaguar House

News

  • Summer Newsletter 2011 The early part of the year has been challenging from a procurement of works perspective and thereafter obtaining approval from clients to commence... Click here to read more...  

Galleries

    Eye Clinic Fit Out for Cheshire Hospital
    Retro Cafe Design and Build fit out North West
    NU Instruments
    Hair and Beauty Salon Refurbishment and fit out North Wales
    Christleton High School Research Library

Clients

    NU Instruments
    Yale College
    Powys Teaching Health Board
    Betsi Cadwaladr
    Renova Developments
    Gresty Brook Medical Centre
    Bala Rural Life
    Knowsley Primary Care Trust
    Diocese of Liverpool
    St Anselm’s College